To edit, add comments or upload photos: Sign In
PKN Orlen ul. Św. Barbarycharging location
Nearest Address:
Świętej Barbary 107
Częstochowa
śląskie
42-226
Poland
This charging location has not been recently verified and you should not rely solely on this information for journeys.
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Number Of Stations/Bays:
2
Usage:
Public
Operational Status:
Operational
Latitude:
50.8027688578948
Longitude:
19.0876205639975
OCM Ref: OCM-126917
Data Provider:
Open Charge Map Contributors http://openchargemap.org
Data License:
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CHAdeMO
Operational
1 Present
OCM-CN-177752
50 kW
DC
CCS (Type 2)
Operational
1 Present
OCM-CN-177753
50 kW
DC
Type 2 (Tethered Connector)
Operational
1 Present
OCM-CN-177754
43 kW
AC (Three-Phase)
400 V
63 A
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 6 matching results
Dworzec PKP Częstochowa
1
1.48 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Politechnika Częstochowska
1.79 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
PKN Orlen Lgota
3.62 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
PKN Orlen ul. Warszawska
3.65 Miles
Public
Operational
Level 3: High (Over 40kW)
CHAdeMO
Public
Operational
Level 3: High (Over 40kW)
CHAdeMO
Greenway Polska Nissan Odyssey Częstochowa
4.2 Miles
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Greenway Polska Auchan Częstochowa Poczesna
5.78 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CHAdeMO
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CHAdeMO
Upload your own photos for this location: Sign In