To edit, add comments or upload photos: Sign In
IONITY Bruchsal Westcharging location
Nearest Address:
Rastanlage Bruchsal West, A5
Forst
76694
Germany
This charging location has not been recently verified and you should not rely solely on this information for journeys.
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Number Of Stations/Bays:
4
Usage:
Public
Usage Cost:
€8,00/session
Operational Status:
Operational
Latitude:
49.16125
Longitude:
8.567226
OCM Ref: OCM-129998
Network/Operator
Ionity http://www.ionity.eu/
Data Provider:
Open Charge Map Contributors http://openchargemap.org
Data License:
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 2)
Operational
4 Present
OCM-CN-181989
350 kW
DC
Other Charging Locations
There are 9 matching results
BAB A5
0.02 Miles
Unknown
Level 3: High (Over 40kW)
CCS (Type 2)
Unknown
Level 3: High (Over 40kW)
CCS (Type 2)
Rasthof Bruchsal West
1
4
0.02 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
Type 2 (Tethered Connector)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
Type 2 (Tethered Connector)
IONITY Bruchsal Ost
1
0.19 Miles
Public - Pay At Location
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Pay At Location
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
BAB5; Autobahnraststätte Bruchsal Ost
0.2 Miles
Operational
Level 3: High (Over 40kW)
Type 2 (Tethered Connector)
Operational
Level 3: High (Over 40kW)
Type 2 (Tethered Connector)
Rasthof Bruchsal Ost
1
1
0.21 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
Type 2 (Tethered Connector)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
Type 2 (Tethered Connector)
Herbert Mohr Holzverarbeitung
0.6 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
ZED
0.77 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Hambrücker Straße 52
0.78 Miles
Operational
Level 2 : Medium (Over 2kW)
CEE 7/4 - Schuko - Type F
Operational
Level 2 : Medium (Over 2kW)
CEE 7/4 - Schuko - Type F
Rathaus
1.06 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)