To edit, add comments or upload photos: Sign In
Walmart 1784 - Salem, ORcharging location
Nearest Address:
3025 Lancaster Dr. NE
Salem
OR
97305
United States
833-632-2778
Number Of Stations/Bays:
4
Usage:
Public
Operational Status:
Operational
Latitude:
44.965504
Longitude:
-122.985356
OCM Ref: OCM-143949
Access Information:
24 hours daily
Network/Operator
Electrify America https://www.electrifyamerica.com/
Data Provider:
Open Charge Map Contributors http://openchargemap.org
Data License:
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 1)
Operational
4 Present
OCM-CN-352235
350 kW
DC
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
Chemeketa Green Lot
0.9 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Chemeketa Red Lot
0.97 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Salem - Kia
1.04 Miles
Public
Not Operational
Level 3: High (Over 40kW)
CHAdeMO
Public
Not Operational
Level 3: High (Over 40kW)
CHAdeMO
BISHOP STEINER BISHOP STEINER
1.04 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
3501 Portland Rd NE Salem OR 97301
1.04 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Doubletree By Hilton Salem
1.15 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Tesla (Model S/X)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Tesla (Model S/X)
ARCO
1.21 Miles
Public
Operational
Level 3: High (Over 40kW)
CHAdeMO
Public
Operational
Level 3: High (Over 40kW)
CHAdeMO
ARCO, Market St, OR
1.21 Miles
Public
Operational
Level 3: High (Over 40kW)
CHAdeMO
Public
Operational
Level 3: High (Over 40kW)
CHAdeMO
Nissan of Salem
1.31 Miles
Private - Restricted Access
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Private - Restricted Access
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Upload your own photos for this location: Sign In