Skip to content
Charging location

Emobitaly Crédit Agricole Green Life

OCM-148397 Operational Public
To edit, add comments or upload photos Sign in
This charging location has not been recently verified and you should not rely solely on this information for journeys.
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In. If the details are inaccurate please edit them.

Summary

Number Of Stations/Bays
1
Usage
Public
Operational Status
Operational
Latitude
44.785613
Longitude
10.296442
OCM Ref
OCM-148397

Network/Operator

Emobitaly (Italy)

Data Provider

Open Charge Map Contributors
Data License
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)

Data Quality Report

Data Quality Score
90 out of 100
  • User Feedback - No recent user verification.
  • User Feedback - Has comments or check-ins
  • User Feedback - Has photos
  • Data Completeness - Usage Type Known
  • Data Completeness - Operational Status Known
  • Data Completeness - Equipment Details Present

Type 2 (Socket Only)

2 present
Status Unknown
22 kW

Add your own comment/check-in for this location

Sign In

Other Charging Locations

There are 9 matching results

Strada Cavagnari 4/A, Parma, PR, Italy
0.09 Miles Public Operational Level 2 : Medium (Over 2kW) Type 2 (Socket Only)
Via la Spezia 189 2/A, Parma, PR, Italy
0.24 Miles Public - Membership Required Operational Level 3: High (Over 40kW) CCS (Type 2)
Via la Spezia, 187, Parma, PR, 43126, Italy
0.24 Miles Public Operational Level 2 : Medium (Over 2kW) Type 2 (Socket Only)
Via la Spezia 193/A, Parma, PR, Italy
0.32 Miles Public Operational Level 2 : Medium (Over 2kW) Type 2 (Socket Only)
Via La Spezia 166, Parma, PR, Italy
0.44 Miles Public Operational Level 3: High (Over 40kW) CCS (Type 2)
Via Abbeveratoia, 4, Parma, PR, 43100, Italy
1.22 Miles Public - Membership Required Operational Level 2 : Medium (Over 2kW) Type 2 (Socket Only)
Via Alexander Fleming 17, Parma, PR, Italy
1.25 Miles Public - Membership Required Operational Level 3: High (Over 40kW) CCS (Type 2)
Upload your own photos for this location Sign In
Uploaded by ForumElettrico.it on 2020-02-01
Uploaded by ForumElettrico.it on 2020-02-01
Uploaded by ForumElettrico.it on 2020-02-01
Uploaded by ForumElettrico.it on 2020-02-01