Skip to content
Charging location

Free To X AdS Lario Ovest

OCM-192475 Operational Public - Membership Required
To edit, add comments or upload photos Sign in
This charging location has not been recently verified and you should not rely solely on this information for journeys.
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In. If the details are inaccurate please edit them.

Nearest Address

A9 km 16 (verso Lainate)
Cadorago
Lombardy
22071
Italy

Summary

Number Of Stations/Bays
5
Usage
Public - Membership Required
Operational Status
Operational
Latitude
45.73003190596444
Longitude
9.028106787563502
OCM Ref
OCM-192475

General Information

in construction

Network/Operator

Free To X

Data Provider

Open Charge Map Contributors
Data License
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)

Data Quality Report

Data Quality Score
90 out of 100
  • User Feedback - No recent user verification.
  • User Feedback - Has comments or check-ins
  • User Feedback - Has photos
  • Data Completeness - Usage Type Known
  • Data Completeness - Operational Status Known
  • Data Completeness - Equipment Details Present

CCS (Type 2)

8 present
Operational
300 kW
DC

CHAdeMO

1 present
Operational
64 kW
DC

Type 2 (Tethered Connector)

1 present
Operational
22 kW
AC (Three-Phase)

CCS (Type 2)

1 present
Operational
64 kW
DC

Add your own comment/check-in for this location

Sign In
General Comment Equipment & Location Confirmed Correct

Sono state raddoppiate le colonnine HPC da 2 a 4 ed anche aggiunto il POS sulla colonnina 1, che può attivare la ricarica anche su tutte le altre. Leggi la recensione completa qui: https://www.forumelettrico.it/forum/post523336.html#p523336

Comment by ForumElettrico.it · 02/21/2026 07:18:14
General Comment Equipment & Location Confirmed Correct

Quattro connettori CCS Combo 2 da 300 kW più una colonnina tristandard, situati nell'area di servizio lungo la Milano-Como in direzione Milano. Leggi la recensione completa qui: https://www.forumelettrico.it/forum/colonnine-freetox-ads-lario-ovest-autostrada-a9-milano-como-t24226.html

Comment by ForumElettrico.it · 12/22/2022 07:30:26

Other Charging Locations

There are 9 matching results

AdS Lario Est, Cadorago, Lombardy, 22071, Italy
0.05 Miles Public Operational Level 3: High (Over 40kW) CCS (Type 2)
A9 km 17 (verso Como Chiasso), Cadorago, CO, Italy
0.05 Miles Public - Pay At Location Operational Level 3: High (Over 40kW) CCS (Type 2)
Via Risorgimento 70, Fino Mornasco, CO, Italy
1.45 Miles Public Operational Level 3: High (Over 40kW) CCS (Type 2)
Via Crespi, Cassina Rizzardi, CO, 22070, Italy
1.67 Miles Public - Membership Required Operational Level 2 : Medium (Over 2kW) Type 2 (Socket Only)
Via Romolo Guffanti, Bulgarograsso, CO, 22070, Italy
1.68 Miles Public - Membership Required Operational Level 2 : Medium (Over 2kW) Type 2 (Socket Only)
Via Risorgimento, 1082, Cassina Rizzardi, CO, 22070 , Italy
1.69 Miles (Unknown) Operational Level 2 : Medium (Over 2kW) Type 2 (Socket Only)
Piazza Paolo Borsellino, Ingresso da Via dei Lali, Bulgarograsso, CO, 22070, Italy
1.81 Miles Public - Membership Required Operational Level 2 : Medium (Over 2kW) Type 2 (Socket Only)
Via Vignetta, 7, Appiano Gentile, CO, 22070, Italy
1.99 Miles Public - Membership Required Operational Level 2 : Medium (Over 2kW) Type 2 (Socket Only)
Via Caio Plinio Secondo, Appiano Gentile, CO, 22070, Italy
2 Miles Public - Membership Required Operational Level 2 : Medium (Over 2kW) Type 2 (Socket Only)
Upload your own photos for this location Sign In
Uploaded by ForumElettrico.it on 2026-02-21
Uploaded by ForumElettrico.it on 2026-02-21
Uploaded by ForumElettrico.it on 2026-02-21
Uploaded by ForumElettrico.it on 2026-02-21
Uploaded by ForumElettrico.it on 2026-02-21
Uploaded by ForumElettrico.it on 2022-12-22