67 Allée Alexandre Borodine 69800 SAINT-PRIEScharging location
Authentification et paiement via l'application mobile Qovoltis. Egalement accessible en roaming selon les conditions du Emsp
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Qovoltis https://www.qovoltis.com/
data.gouv.fr https://www.data.gouv.fr/fr/datasets/fichier-consolide-des-bornes-de-recharge-pour-vehicules-electriques/
Open License: https://www.etalab.gouv.fr/wp-content/uploads/2014/05/Licence_Ouverte.pdf
FR*QOV*69-00001
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Tethered Connector)
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
SPR02 - PORTE DES ALPES
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
EVZen Norauto - Saint Priest
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Tesla Supercharger Bron
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Electra - Bron - Novotel
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
PowerDot - Hôtel F1 - Saint-Priest
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Allego - Burger King Lyon Bron
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Engie-Vianeo - B&B Hôtel Lyon Eurexpo Bron
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
SPR06 - PARKING HENRI MARECHAL
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Engie-Vianeo - B&B Hôtel Lyon Saint-Priest
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Upload your own photos for this location: Sign In