Skip to content
Charging location

Be Charge Municipio

OCM-210472 Operational Public
To edit, add comments or upload photos Sign in
This charging location has not been recently verified and you should not rely solely on this information for journeys.
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In. If the details are inaccurate please edit them.

Summary

Number Of Stations/Bays
1
Usage
Public
Operational Status
Operational
Latitude
45.200589
Longitude
10.366523
OCM Ref
OCM-210472

Network/Operator

Be Charge (Italy)

Data Provider

Open Charge Map Contributors
Data License
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)

Data Quality Report

Data Quality Score
90 out of 100
  • User Feedback - No recent user verification.
  • User Feedback - Has comments or check-ins
  • User Feedback - Has photos
  • Data Completeness - Usage Type Known
  • Data Completeness - Operational Status Known
  • Data Completeness - Equipment Details Present

Type 2 (Socket Only)

2 present
Status Unknown
22 kW

Add your own comment/check-in for this location

Sign In

Other Charging Locations

There are 9 matching results

Via Runate, 15, Canneto sull'Oglio, 46013, Italy
2.09 Miles Public - Membership Required Operational Level 2 : Medium (Over 2kW) Tesla (Model S/X)
Via della Vittoria 7, Asola, MN, 46041, Italy
2.8 Miles Public - Membership Required Operational Level 2 : Medium (Over 2kW) Type 2 (Socket Only)
Piazza Parma, Asola, Lombardy, 46041, Italy
2.88 Miles Public Operational Level 2 : Medium (Over 2kW) Type 2 (Socket Only)
Strada San Giacomo 2/A, Fiesse, BS, Italy
3.03 Miles Public Operational Level 2 : Medium (Over 2kW) Type 2 (Socket Only)
Via Don Giovanni Maria Santi 1, Isola Dovarese, CR, Italy
3.15 Miles Public Operational Level 3: High (Over 40kW) CCS (Type 2)
Via V Maggio 10, Canneto sull'Oglio, MN, Italy
3.45 Miles Public Operational Level 2 : Medium (Over 2kW) Type 2 (Socket Only)

A2A Conad

1 5
Via Montello 26, Gambara, BS, Italy
4.77 Miles Public Operational Level 3: High (Over 40kW) CCS (Type 2)
Via Felice Cavallotti 65, Piadena, CR, Italy
4.79 Miles Public Operational Level 3: High (Over 40kW) CCS (Type 2)

A2A

1 5
Via Gazzo 3, Gambara, BS, Italy
4.97 Miles Public Operational Level 2 : Medium (Over 2kW) Type 2 (Socket Only)
Upload your own photos for this location Sign In
Uploaded by ForumElettrico.it on 2022-12-11
Uploaded by ForumElettrico.it on 2022-12-11
Uploaded by ForumElettrico.it on 2022-12-11
Uploaded by ForumElettrico.it on 2022-12-11
Uploaded by ForumElettrico.it on 2022-12-11