To edit, add comments or upload photos: Sign In
Pol. Industrial Villasante (Aduriz Energía)charging location
Nearest Address:
Villasante
Merindad de Montija
Burgos
09569
Spain
900 373 626
900 676 082
General Information:
Aduriz Energía
Number Of Stations/Bays:
4
Usage:
Public - Membership Required
Usage Cost:
DC 120kW: 0,55€/kWh - AC/DC 50kW: 0,40€/kWh
Operational Status:
Operational
Latitude:
43.05756234117143
Longitude:
-3.4775881333262646
OCM Ref: OCM-311268
Data Provider:
Open Charge Map Contributors http://openchargemap.org
Data License:
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 80 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 2)
Operational
2 Present
OCM-CN-599814
120 kW
DC
920 V
300 A
Ingeteam RAPID180 Charger (375A peak). The DC charger allows charging one vehicle at 120kW, or two simultaneous charges at 60kW. Charging power limited for 400V cars
CCS (Type 2)
Operational
1 Present
OCM-CN-599815
50 kW
DC
400 V
125 A
CHAdeMO
Operational
1 Present
OCM-CN-599816
50 kW
DC
400 V
125 A
Type 2 (Tethered Connector)
Operational
1 Present
OCM-CN-599817
22 kW
AC (Three-Phase)
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
Iglesia Espinosa de los Monteros
3.98 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Calle del Pedrero
1
4 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Calle Nuestra Señora de las Nieves
4.32 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Medina de Pomar - Burgos
1
8.56 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Mercadona Medina Pomar
8.57 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Medina Pomar (Aduriz Energía)
1
8.83 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Medina de Pomar (Acciona)
8.99 Miles
Public - Membership Required
Planned For Future Date
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Planned For Future Date
Level 3: High (Over 40kW)
CCS (Type 2)
Ayuntamiento de Villarcayo
1
Ayuntamiento de Villarcayo
Villarcayo de Merindad de Castilla la Vieja
Castile and León
09550
Spain
View
9.46 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Plaza Mayor Villarcayo
1
9.5 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)