New Turk Lake Marketcharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Store business hours
afdc.energy.gov http://www.afdc.energy.gov/
This data is provided by the National Renewable Energy Laboratory ("NREL"), which is operated by the Alliance for Sustainable Energy, LLC ("Alliance"), for the U.S. Department of Energy ("DOE"), and may be used for any purpose whatsoever.
38538
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - Has recent user verification
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Unknown Operational Status
- Data Completeness - Equipment Details Present
Type 1 (J1772)
Type 1 (J1772)
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 5 matching results
TINNEY AUTOMOTIVE CORP.
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 1)
Log Cabin Marathon
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 1)
Log Cabin Marathon
1
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 1)
VIKING GROCERY VIKING 1
Public
Operational
Level 3: High (Over 40kW)
CHAdeMO
Citgo - Howard City
Public
Operational
Level 3: High (Over 40kW)
CHAdeMO
Upload your own photos for this location: Sign In