Zoocharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Immer nutzbare Parkplätze im Parkhaus, die bis 6 Stunden Parkdauer kostenlos sind. Steckerverriegelung wird mit PIN auf dem Parkschein freigeschaltet, also freier Zugang zur Ladeenergie. Die Steckdosen sind im hinteren Parkhaus, das manchmal geschlossen ist. In diesem Fall am Schalter an der Einfahrt melden, damit es geöffnet wird.
Stadtwerke Leipzig SWL http://www.swl.de/web/swl/DE/Unternehmen/Elektromobilitaet/Elektromobilitaet.htm 0341 121-6404
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Socket Only)
CEE 7/4 - Schuko - Type F
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
Parkplatz Kickerlingsberg
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Stadtwerke Leipzig Nord
Public
Operational
Level 2 : Medium (Over 2kW)
CEE 5 Pin
Nordstraße 25
Unknown
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Hotel The Westin
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Naturkundemuseum
Public - Pay At Location
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Hotel Travel24
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Willy-Brandt Platz 7
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Höfe Am Brühl
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Tesla (Model S/X)
Hauptbahnhof
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Upload your own photos for this location: Sign In