To edit, add comments or upload photos: Sign In
Østerild Skole (PowerGo)charging location
Nearest Address:
Vesterbyvej 1
Thisted
7700
Denmark
Usage:
Public - Membership Required
Operational Status:
Operational
Latitude:
57.028900146484375
Longitude:
8.841711044311523
OCM Ref: OCM-456844
Network/Operator
PowerGo https://www.powergo.energy
Data Provider:
PowerGo https://www.powergo.energy/
Data License:
Licensed under CC0 by data sharing agreement
Providers Ref:
26732
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Tethered Connector)
Operational
1 Present
OCM-CN-767220
12.7 kW
AC (Three-Phase)
230 V
32 A
Type 2 (Tethered Connector)
Operational
1 Present
OCM-CN-767221
12.7 kW
AC (Three-Phase)
230 V
32 A
Type 2 (Tethered Connector)
Operational
1 Present
OCM-CN-767222
12.7 kW
AC (Three-Phase)
230 V
32 A
Type 2 (Tethered Connector)
Operational
1 Present
OCM-CN-767223
12.7 kW
AC (Three-Phase)
230 V
32 A
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
Sennels Skole (PowerGo)
4.35 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Plejecenter Fjordglimt (PowerGo)
4.89 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Brandstation Hurup (PowerGo)
6.36 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Nors Skole SFO (PowerGo)
6.45 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Børnehuset Rolighed (PowerGo)
6.51 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Rolighedsskolen (PowerGo)
6.59 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Tømmerby-Lild Skole (PowerGo)
6.63 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Hjemmeplejen Nord (PowerGo)
6.73 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Pædagoguddannelsen Thisted (PowerGo)
6.79 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Upload your own photos for this location: Sign In