EVN Public Charging Station (AC).charging location
3 parking places dedicated to EVs,but often blocked by ICE cars;on 1 of the places local municipal e-van has a priority;otherwise unlimited public access.
EVN (Bulgaria) https://evn.bg/SpecialPages/e-mobility.aspx 0700 1 7777
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - Has recent user verification
- User Feedback - Has comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CEE 7/4 - Schuko - Type F
Free charging from this socket. No authentication needed.
Type 2 (Socket Only)
EVN tariff, RFID card authentication. Max.3hrs.
Type 2 (Tethered Connector)
A municipal van has reserved priority of charging here.
Add your own comment/check-in for this location:
Sign InRating: 2 out of 5 [ General Comment , Charged Successfully ]While 2 days ago i charged successfully withou any troubles from free Schuko socket,today i had these troubles:Visit @ April 10, 2026: An asshole saboteur was obstructing 2 of 3 parking bays reserved for (PH)EV charging by his van(diesel) & his trailer with a mobile shop,he also expelled me out of the 3rd parking bay reserved for EVs,he told,he payed for 2 places,but he was blocking all 3 places,he was rude & forced me to move to the neighboring parking lot,but even against his sabotage i charged successfully from free Schuko socket thanx to my 25m long extension cable, now I used its full length 1st time,so I advice to every1 to have @ least 25m long extension cable onboard, it proved to be necessary... The saboteur's registry: KO880HP.
Comment by Como.Sabina Green. 04/10/2026 14:30:24
Rating: 5 out of 5 [ General Comment , Charged Successfully ]Visit @ April 08, 2026: Everything OK,charged successfully from free Schuko socket.
Comment by Como.Sabina Green. 04/10/2026 12:46:51
Rating: 2 out of 5 [ Important Notice (For Other Users) , Charged Successfully ]Mennekes: Payed,charging time max.3hrs, extra fees, if exceeded, restart charging every 3hrs. to avoid extra fees.May be blocked by ICE cars.Schuko: Free charging, no authentication, no time limit & if charging station is blocked,U can use extension cable.When I was charging here,whole parking lot was blocked:1 bay was in use by the e-van,which has here a reserved place,2 other parking bays was blocked by ICE cars(1 had Czech registry & the other had Slovak registry),thus I had to charge on road in front of them using extension cord, thus of course Schuko socket. Charging was successful, but very inconvenient, because as I could not normally dock my vehicle to charging station & I had to charge on road with emergency lights on & ready to depart if asked by cops or so,thus I could not go away from the vehicle to find a restaurant, toilet,or so,U will most probably experience the same problem here,as those ignorants r probably regular commuters from countries with least EV support,thus they will probably continue to block the charging station regularly & cops r probably very rare here,as they r obviously not afraid of fines for blocking a charging station by ICE cars...So if U r planning to charge here,have an extension cable onboard, at least 10m long.Live long & prosper.
Comment by Como.Sabina Green. 09/28/2025 15:36:44
Other Charging Locations
There are 9 matching results
Felix Sommer Hotel - Restaurant - Vinothek
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Tesla (Model S/X)
EVN Public Charging Station (AC).
1
Public - Pay At Location
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
EVN Public Charging Station (AC).
1
Public - Pay At Location
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Smatrics Fast Distributore OMV
1
(Unknown)
Operational
Level 3: High (Over 40kW)
CHAdeMO
IONITY Hochleithen
2
Public - Pay At Location
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
EVN AC Public Carging Station.
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Schloßplatz
Public
Operational
E-Bus Charging Station.
1
Private - For Staff, Visitors or Customers
Operational
Stromquelle Manner Wolkersdorf
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Upload your own photos for this location: Sign In