To edit, add comments or upload photos: Sign In
Dia a Dia - Ceilândia Centrocharging location
Nearest Address:
Ceilândia Sul QNM 11 Lote 05 - Ceilândia
Brasília
Brazil
Usage:
Public - Membership Required
Operational Status:
Operational
Latitude:
-15.820293
Longitude:
-48.10227
OCM Ref: OCM-464056
Data Provider:
Easy Volt https://www.ezvolt.com.br
Note: This data is sourced automatically, changes should ideally be submitted to the data provider directly.
Data License:
CC-0
Providers Ref:
019814b2-fdda-7000-8fb7-576f36e01b34
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 2)
Operational
1 Present
OCM-CN-780863
60 kW
DC
380 V
200 A
CCS (Type 2)
Operational
1 Present
OCM-CN-780864
60 kW
DC
380 V
200 A
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
Dia a Dia - Ceilândia Sul
1.18 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Ceilândia Mall
1.62 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Posto Colina - Psul
1.62 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Super Adega QNL Taguatinga
2.18 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Clínica Tatiana Medicina e Imagem
2.6 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Dia a Dia - BR 070
2.83 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Moreno Bar
2.86 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Dia a Dia - Vicente Pires (Rua 12)
3.73 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
NetPark - Connect Towers
4.05 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Upload your own photos for this location: Sign In