To edit, add comments or upload photos: Sign In
Jumbo 6518 Ter Apel (PowerGo)charging location
Nearest Address:
Nederveen Cappelstraat 41
Ter Apel
9561KM
Netherlands
Usage:
Public - Membership Required
Operational Status:
Operational
Latitude:
52.87522888183594
Longitude:
7.059174060821533
OCM Ref: OCM-464102
Network/Operator
PowerGo https://www.powergo.energy
Data Provider:
PowerGo https://www.powergo.energy/
Data License:
Licensed under CC0 by data sharing agreement
Providers Ref:
15045
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 2)
Operational
1 Present
OCM-CN-781040
90 kW
DC
500 V
180 A
CCS (Type 2)
Operational
1 Present
OCM-CN-781041
90 kW
DC
500 V
180 A
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
Boslaan 6
0.73 Miles
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Marktstraat 74T
4.21 Miles
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Marienstraße 2
4.62 Miles
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Zonnepark Emmen (PowerGo)
5.15 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Sluisstraat 56
5.5 Miles
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Emmerhoutstraat
7.1 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Voetbalvereniging Nieuw Buinen (PowerGo)
7.51 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
‘t Wapen van Exloo (PowerGo)
7.81 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
LEAP24 Charging Station
7.94 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Upload your own photos for this location: Sign In