Plenitude IKEAcharging location
Be Charge (Italy) https://www.bec.energy/
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 100 out of 100
- User Feedback - Has recent user verification
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 2)
CCS (Type 2)
Type 2 (Tethered Connector)
Type 2 (Socket Only)
Add your own comment/check-in for this location:
Sign In[ General Comment , Charged Successfully ]Tutto ok fino ad almeno 200 kW sulla HPC centrale e dietro abbiamo il classico IKEA con bar e bistrò che apre alle 10 e chiude alle 21. Leggi la recensione completa qui: https://www.forumelettrico.it/forum/serie-di-colonnine-becharge-presso-ikea-zona-industriale-catania-t37452.html
https://www.forumelettrico.it/forum/serie-di-colonnine-becharge-presso-ikea-zona-industriale-catania-t37452.html Comment by ForumElettrico.it 01/03/2026 15:27:41
Other Charging Locations
There are 9 matching results
IKEA di Catania
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Strano
1
3
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Ewiva Lukoil
1
3
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Evway Audi Catania
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Enel Fast Green Power Catania
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Fast Parking
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Hotel NH Parco Degli Aragonesi
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Unknown
Romano Palace Luxury Hotel
Public - Notice Required
Operational
Level 2 : Medium (Over 2kW)
Tesla (Model S/X)
Catania Nissan Comer Sud
1
Private - For Staff, Visitors or Customers
Operational
Level 3: High (Over 40kW)
CHAdeMO
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2026-01-03
Uploaded by ForumElettrico.it on 2026-01-03
Uploaded by ForumElettrico.it on 2026-01-03
Uploaded by ForumElettrico.it on 2026-01-03
Uploaded by ForumElettrico.it on 2026-01-03