To edit, add comments or upload photos: Sign In
Fairfield By Marriotcharging location
Nearest Address:
Fairfield By Mareiot,
Jl Husein Sastranegara, Benda
Tangerang
Banten
15125
Indonesia
Number Of Stations/Bays:
1
Usage:
Public
Operational Status:
Operational
Latitude:
-6.115285580263688
Longitude:
106.68396729628535
OCM Ref: OCM-480013
Network/Operator
Voltron (Indonesia) https://voltron.id/ +62 8781 0584 499
Data Provider:
Open Charge Map Contributors http://openchargemap.org
Data License:
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 2)
Operational
2 Present
OCM-CN-805871
100 kW
DC
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
CGK Hub
0.11 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
(iGREEN+) 107 Soekarno Hatta
0.12 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
(MY PERTAMINA) SPBU 31.151.01
(MY PERTAMINA) SPBU 31.151.01,
Perimeter Utara Bandara Soekarno Hatta
Tangerang
Banten
15125
Indonesia
View
0.24 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
(iGreen+) Kavling E3 - Soetta
0.27 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Bandara City Mall
1.73 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Suppawash Cengkareng
3.27 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
SPKLU Center Aloha PIK 2
3.66 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Elang Laut PIK
3.89 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Batavia PIK 2
3.98 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Upload your own photos for this location: Sign In