To edit, add comments or upload photos: Sign In
IDD - Indonesia Design District PIK 2charging location
Nearest Address:
IDD - Indonesia Design District PIK 2,
Jl M.H Thamrin, Pantai Indah Kapuk 2
Tangerang
Banten
15214
Indonesia
Number Of Stations/Bays:
1
Usage:
Public
Usage Cost:
IDR2467/kWh ++
Operational Status:
Operational
Latitude:
-6.0491217
Longitude:
106.7027144
OCM Ref: OCM-480014
Network/Operator
Voltron (Indonesia) https://voltron.id/ +62 8781 0584 499
Data Provider:
Open Charge Map Contributors http://openchargemap.org
Data License:
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 2)
Operational
4 Present
OCM-CN-805872
100 kW
DC
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
Angke Heritage PIK 2
Angke Heritage PIK 2, Jl M. Husni Thamrin,
Pantai Indah Kapuk 2
Tangerang
Banten
15214
Indonesia
View
0.14 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
(DAYA GREEN) Poin PIK 2
0.44 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
HVT Centre Point PIK 2
HVT Center Point PIK 2,
Kawasan Centre Point Pantai Indah Kapuk 2, Kec Kosambi
Kabupaten Tangerang
Banten
Indonesia
View
0.55 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Kota Belanda PIK 2
Kota Belanda PIK 2,
Jl Otto Iskandardinata, Pantai Indah Kapuk 2
Tangerang
Banten
15214
Indonesia
View
0.77 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
SPKLU Center Aloha PIK 2
1.75 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Bandara City Mall
3.02 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Batavia PIK 2
4.12 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Central Market PIK 2
4.18 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
(iGreen+) Kavling E3 - Soetta
4.48 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Upload your own photos for this location: Sign In