To edit, add comments or upload photos: Sign In
Edison Next AdS Scaligera Sudcharging location
Nearest Address:
A4 km 301 (verso Trieste)
Verona
VR
Italy
Number Of Stations/Bays:
1
Usage:
Public
Operational Status:
Operational
Latitude:
45.410397
Longitude:
11.234368
OCM Ref: OCM-499380
Data Provider:
Open Charge Map Contributors http://openchargemap.org
Data License:
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 100 out of 100
- User Feedback - Has recent user verification
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 2)
Status Unknown
2 Present
OCM-CN-851366
100 kW
DC
Add your own comment/check-in for this location:
Sign In[ General Comment , Equipment & Location Confirmed Correct ]Nuova colonnina installata di recente e dotata di due CCS Combo 2 da 120 kW, che è andata a sistituire una vecchia multistandard non funzionante da tempo. Leggi la recensione completa qui: https://www.forumelettrico.it/forum/colonnina-edison-next-ultra-fast-ads-scaligera-sud-verona-vr-a4-km-301-verso-trieste-t46403.html
https://www.forumelettrico.it/forum/colonnina-edison-next-ultra-fast-ads-scaligera-sud-verona-vr-a4-km-301-verso-trieste-t46403.html Comment by ForumElettrico.it 07/18/2026 06:11:58
Other Charging Locations
There are 9 matching results
Emotion AdS Scaligera Sud
1
5
0 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Plenitude AdS Scaligera Nord
1
2
0.14 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
NEOGY Viale della Vittoria
0.68 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Enel X McDonald's Villabella
2
7
0.71 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
NEOGY Via San Matteo
0.9 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
NEOGY Piazza Costituzione
0.94 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
NEOGY Via Covergnino
1.05 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
NEOGY Via Luigi Adami
1.18 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Residenza Ai Capitelli
1.4 Miles
Public - Notice Required
Operational
Level 2 : Medium (Over 2kW)
Tesla (Model S/X)
Public - Notice Required
Operational
Level 2 : Medium (Over 2kW)
Tesla (Model S/X)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2026-07-18
Uploaded by ForumElettrico.it on 2026-07-18
Uploaded by ForumElettrico.it on 2026-07-18
Uploaded by ForumElettrico.it on 2026-07-18
Uploaded by ForumElettrico.it on 2026-07-18