To edit, add comments or upload photos: Sign In
Plaza Senayancharging location
Nearest Address:
Plaza Senayan,
Jl Asia Afrika
Jakarta Selatan
DKI Jakarta
10270
Indonesia
Number Of Stations/Bays:
1
Usage:
Public
Operational Status:
Operational
Latitude:
-6.2257288731655365
Longitude:
106.80046415877598
OCM Ref: OCM-501357
Network/Operator
Starvo (Indonesia) https://starvo.co.id/ +62 2129215000
Data Provider:
Open Charge Map Contributors http://openchargemap.org
Data License:
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Tethered Connector)
Operational
8 Present
OCM-CN-857825
7 kW
AC (Single-Phase)
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
(iGreen+) Ratu Plaza
0.12 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Panin Bank
0.14 Miles
Public
Not Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Not Operational
Level 3: High (Over 40kW)
CCS (Type 2)
(TERRA CHARGE) FX Sudirman
0.22 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Summitmas Tower 1
Jl. Jenderal Sudirman No.Kav. 61-62, RT.5/RW.3, Senayan, Kec. Kby. Baru
Jakarta Selatan
Jakarta
12190
Indonesia
View
0.23 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Artotel Gelora Senayan
0.24 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Senayan City
0.29 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Medco Energy Building
0.41 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
(Daya Green) Office 8 Senopati
0.44 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Apartemen Senayan Residence
0.45 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Upload your own photos for this location: Sign In