To edit, add comments or upload photos: Sign In
Rue Le Chapeliercharging location
Nearest Address:
Rue Le Chapelier
Chartrons - Grand Parc - Jardin Public
Nouvelle-Aquitaine
33000
France
Number Of Stations/Bays:
1
Usage:
Public
Usage Cost:
0,4 / kwH
Operational Status:
Operational
Latitude:
44.8506967185854
Longitude:
-0.5815878296704113
OCM Ref: OCM-504487
Network/Operator
Freshmile https://www.freshmile.com/
Data Provider:
Open Charge Map Contributors http://openchargemap.org
Data License:
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 2)
Operational
1 Present
OCM-CN-864475
22 kW
Type 2 (Socket Only)
Operational
1 Present
OCM-CN-864476
22 kW
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
La Grande Maison de Bernard Magrez
0.4 Miles
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Cours Georges Clémenceau - Bordeaux
0.54 Miles
Public - Notice Required
Operational
Public - Notice Required
Operational
Parking Cité Mondiale
0.56 Miles
Public
Unknown
Public
Unknown
Parking "Gambetta"
0.74 Miles
Public
Unknown
Public
Unknown
Hôtel le Burdigala
0.79 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Parking "Front du Médoc"
0.83 Miles
Public
Unknown
Public
Unknown
Hotel Mercure Bordeaux Château Chartrons
0.85 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Auchan BORDEAUX MERIADECK
0.86 Miles
Public - Membership Required
Planned For Future Date
Level 3: High (Over 40kW)
CHAdeMO
Public - Membership Required
Planned For Future Date
Level 3: High (Over 40kW)
CHAdeMO
Parking "Pey-Berland / Saint-Christoly"
0.89 Miles
Public
Unknown
Public
Unknown
Upload your own photos for this location: Sign In