To edit, add comments or upload photos: Sign In
mblty Niederaula Truckcharging location
Number Of Stations/Bays:
2
Usage:
Public
Operational Status:
Operational
Latitude:
50.77812536560651
Longitude:
9.58802833723746
OCM Ref: OCM-510295
Network/Operator
Tank & Rast http://tank.rast.de/emobility/ +49 228 9220
Data Provider:
Open Charge Map Contributors http://openchargemap.org
Data License:
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 2)
Operational
2 Present
OCM-CN-879066
340 kW
DC
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
Trigema EnBW HPC
3.81 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Ionity Kirchheim (Tal) 2
3.87 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
IONITY Kirchheim (Tal)
3.92 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Tesla Supercharger Kirchheim
3.96 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Autohof Kirchheim
2
1
3.96 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CHAdeMO
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CHAdeMO
Parkplatz Rathaus
4.13 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
CEE 7/4 - Schuko - Type F
Public
Operational
Level 2 : Medium (Over 2kW)
CEE 7/4 - Schuko - Type F
Rasthof Rimberg Nord
5.13 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
Type 2 (Tethered Connector)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
Type 2 (Tethered Connector)
ADS-TEC Energy Bad Hersfeld
5.37 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Rasthof Großenmoor Ost
5.48 Miles
Public
Operational
Level 3: High (Over 40kW)
Type 2 (Tethered Connector)
Public
Operational
Level 3: High (Over 40kW)
Type 2 (Tethered Connector)
Upload your own photos for this location: Sign In