To edit, add comments or upload photos: Sign In
Rua Hercílio Luzcharging location
Nearest Address:
Rua Hercílio Luz
Centro
Santa Catarina
88301-400
Brazil
General Information:
Estação de Recarga para Veículos Elétricos • Potência: 40 kW • Conector: CCS2 • Tarifa padrão: R$ 2,30 por kWh • Tarifa para motoristas de aplicativo: R$ 1,89 por kWh • Início da recarga pelo App Charger Point
Number Of Stations/Bays:
1
Usage:
Public - Membership Required
Usage Cost:
3,8
Operational Status:
Operational
Latitude:
-26.905095231122488
Longitude:
-48.655064173225696
OCM Ref: OCM-510940
Data Provider:
Open Charge Map Contributors http://openchargemap.org
Data License:
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 2)
Operational
2 Present
OCM-CN-880263
60 kW
DC
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
Posto Ipiranga Galo (antigo posto universitário )
1
1.34 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Shell Recharge | Posto Agricopel 12 - Itajaí SC
3.43 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Posto SONHO MEU Brava
1
Av. do Estado Dalmo Vieira, 133
Praia dos Amores
Balneário Camboriú
Santa Catarina
88338-491
Brazil
View
3.73 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Posto Zandoná Z14
1
5.72 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Posto Graal Parada Sul
8.81 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Posto Graal Parada Norte
8.87 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Posto Américan Oil
8.98 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Banka Panka
10.76 Miles
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Di Paolo
11.71 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Upload your own photos for this location: Sign In