To edit, add comments or upload photos: Sign In
旭川日産豊岡店charging location
Nearest Address:
豊岡3条2丁目2-3
旭川市
北海道
078-8231
Japan
Number Of Stations/Bays:
1
Usage:
Public
Usage Cost:
各社eMP系充電カード・都度クレカ決済(ビジター可)
Operational Status:
Operational
Latitude:
43.75954493483613
Longitude:
142.39165441856608
OCM Ref: OCM-510946
Network/Operator
e-Mobility Power (JP) https://www.e-mobpower.co.jp/
Data Provider:
Open Charge Map Contributors http://openchargemap.org
Data License:
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CHAdeMO
Operational
2 Present
OCM-CN-880271
50 kW
DC
450 V
125 A
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
フレスポ旭川龍谷 / 大和リース(株)
0.59 Miles
Public
Operational
Level 3: High (Over 40kW)
CHAdeMO
Public
Operational
Level 3: High (Over 40kW)
CHAdeMO
ENEOS南6条通りSS
0.79 Miles
Temporarily Unavailable
Level 2 : Medium (Over 2kW)
CHAdeMO
Temporarily Unavailable
Level 2 : Medium (Over 2kW)
CHAdeMO
セブン-イレブン 旭川東光2条店
0.9 Miles
Public
Operational
Level 3: High (Over 40kW)
CHAdeMO
Public
Operational
Level 3: High (Over 40kW)
CHAdeMO
ENECHANGE EV 充電スタンド
1
1.14 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
旭川 BMW/BMW Premium Selection 旭川
1.37 Miles
Public
Operational
Level 3: High (Over 40kW)
CHAdeMO
Public
Operational
Level 3: High (Over 40kW)
CHAdeMO
セブン-イレブン 旭川神楽岡5条店
2
1.46 Miles
Public
Operational
Level 3: High (Over 40kW)
CHAdeMO
Public
Operational
Level 3: High (Over 40kW)
CHAdeMO
イオンモール旭川駅前店
1.74 Miles
Public
Operational
Level 3: High (Over 40kW)
CHAdeMO
Public
Operational
Level 3: High (Over 40kW)
CHAdeMO
ENEOS チャレンジ 旭川神楽SS/北海道エネルギー(株)
1
1.89 Miles
Public
Operational
Level 3: High (Over 40kW)
CHAdeMO
Public
Operational
Level 3: High (Over 40kW)
CHAdeMO
旭川日産自動車(株) 神楽店
1.98 Miles
Public
Operational
Level 3: High (Over 40kW)
CHAdeMO
Public
Operational
Level 3: High (Over 40kW)
CHAdeMO
Upload your own photos for this location: Sign In