Kirkstall Bridge Shopping Parkcharging location
This is an open charge unit installed at the Kirkstall Bridge Shopping Park in Bridge Road, Leeds
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Parking free for up to 2.5 hours between 06:30 and 21:00 (enforced by ANPR), must pay to park for longer or outside these hours via "NexusPay" or "Connect by PayByPhone" app.
POD Point (UK) http://www.pod-point.com/ 020 7247 4114
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Socket Only)
Jeri-Dave
Add your own comment/check-in for this location:
Sign InRating: 5 out of 5 [ General Comment , Charged Successfully ]Useful free charger. Parking free for up to 2.5 hours 6:30-21:00 (enforced by ANPR), must pay to park for longer or outside these hours via NexusPay app.
Comment by Ezra 06/02/2024 21:10:21
Other Charging Locations
There are 9 matching results
Abbey Retail Park
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Abbey Retail Park
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Morrisons Kirkstall
Public - Pay At Location
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
LeedsBeckett
Public - Pay At Location
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Riverside Service Station
Public - Pay At Location
Operational
Level 3: High (Over 40kW)
CHAdeMO
LeedsBeckett
Public - Pay At Location
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Landsec-Cardigan Fields
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
First On Scene Training
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Cloth Halls
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Upload your own photos for this location: Sign In
Uploaded by Ezra on 2024-06-02
Uploaded by Ezra on 2024-06-02
pod-point Jeri-Dave
Uploaded by Ezra on 2024-06-02
Uploaded by Szabó Attila (Kátli) on 2017-10-23
Uploaded by Szabó Attila (Kátli) on 2017-10-23