To edit, add comments or upload photos: Sign In
Aguilar de Campoocharging location
Nearest Address:
Barrio Jose Gomez Briz S/N
Aguilar de Campoo
Palencia
Spain
Number Of Stations/Bays:
1
Usage:
Public - Membership Required
Usage Cost:
free
Operational Status:
Not Operational
Latitude:
42.79536284921332
Longitude:
-4.265400745293164
OCM Ref: OCM-99318
Network/Operator
Fenie Energía (Spain) http://recarga.fenieenergia.es/
Data Provider:
Open Charge Map Contributors http://openchargemap.org
Data License:
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 80 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Socket Only)
Operational
1 Present
OCM-CN-140333
7 kW
AC (Single-Phase)
230 V
32 A
CEE 7/4 - Schuko - Type F
Operational
1 Present
OCM-CN-140334
2.3 kW
AC (Single-Phase)
230 V
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
Repsol Aguilar de Campoo
1
0.15 Miles
Public - Membership Required
Not Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Not Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Talleres Báscones SEAT
0.24 Miles
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
CEE 3 Pin
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
CEE 3 Pin
Ayunt. Aguilar de Campoo Avenida del Soto
1
0.6 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Restaurante Los Olmos
1
1.01 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Tesla Supercharger Aguilar De Campoo
1.07 Miles
Public - Membership Required
Planned For Future Date
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Planned For Future Date
Level 3: High (Over 40kW)
CCS (Type 2)
Hotel El Convento
5.02 Miles
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Puerta de la Montaña (Zunder)
2
5.52 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Ayunt. Salinas de Pisuerga
1
6.87 Miles
Public
Partly Operational (Mixed)
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public
Partly Operational (Mixed)
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Repsol Mataporquera
1
7.46 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)