Budapest, Magyar Tudományos Akadémiacharging location
🇭🇺 2 x 22 kW AC, eCharge+ applikáción keresztüli kártyás fizetés szükséges a töltés indításához. 🇬🇧 2 x 22 kW AC, card payment via eCharge+ application is required to start charging.
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
A töltőoszlop nem a két parkoló között középen van, így az egyik autóhoz nagyon hosszú kábel kellhet. / The charger is not in the middle of the two parking spots, therefore one of the cars might need a longer than normal charging cable.
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution-ShareAlike 4.0 International (CC BY-SA 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Socket Only)
Add your own comment/check-in for this location:
Sign InRating: 3 out of 5 [ General Comment , Charged Successfully ]Hátrébb kellett tolatnom egy kicsit, hogy a másik autó is elég közel állhasson a töltőhöz. / Had to back up a bit to allow the other car in the other spot to park close enough to the charger.
http://on.bubb.li/236262aae4veoqypkg8gw5g/ Comment by tibor.antaloczy 5/12/2015 8:19:05 PM
Other Charging Locations
There are 9 matching results
Budapest, Intercontinental
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
CEE 5 Pin
Budapest, Hotel Kempinski Corvinus
2
6
Public
Operational
Level 2 : Medium (Over 2kW)
CEE 7/4 - Schuko - Type F
Budapest, Szent István Bazilika
1
2
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Budapest, Lánchíd u. 5.
1
3
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Budapest, Alkotmány u. 8.
2
8
Public
Operational
Level 3: High (Over 40kW)
CHAdeMO
Budapest, Káldy Gyula utcai mélygarázs
1
3
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Budapest, Fő utca 44-55.
1
3
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Budapest, Várkert Bazár mélygarázs
2
9
Public
Operational
Level 3: High (Over 40kW)
CHAdeMO
Budapest, Hotel Hilton Budapest
Public - Pay At Location
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Upload your own photos for this location: Sign In

Uploaded by tibor.antaloczy on 2015-05-16

Uploaded by tibor.antaloczy on 2015-05-12

Uploaded by tibor.antaloczy on 2015-05-12