Skip to content
Charging location

Blitz Power AdS Montaio Ovest

OCM-167674 Operational Public - Membership Required
To edit, add comments or upload photos Sign in
This charging location has not been recently verified and you should not rely solely on this information for journeys.
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In. If the details are inaccurate please edit them.

Nearest Address

Autostrada A15 della Cisa km 65,430
direzione La Spezia
Pontremoli
MS
54027
Italy

Summary

Number Of Stations/Bays
1
Usage
Public - Membership Required
Operational Status
Operational
Latitude
44.41451346346156
Longitude
9.870638447912597
OCM Ref
OCM-167674

Data Provider

Open Charge Map Contributors
Data License
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)

Data Quality Report

Data Quality Score
90 out of 100
  • User Feedback - No recent user verification.
  • User Feedback - Has comments or check-ins
  • User Feedback - Has photos
  • Data Completeness - Usage Type Known
  • Data Completeness - Operational Status Known
  • Data Completeness - Equipment Details Present

CCS (Type 2)

1 present
Operational
95 kW
DC

CHAdeMO

1 present
Operational
75 kW
DC

Type 2 (Socket Only)

1 present
Operational
22 kW
400 V
32 A
AC (Three-Phase)

Add your own comment/check-in for this location

Sign In

Other Charging Locations

There are 9 matching results

Via Bernardino Campi, Pontremoli, MS, 54027 , Italy
2.78 Miles Public - Membership Required Operational Level 2 : Medium (Over 2kW) Type 2 (Socket Only)
A15 km 54 (verso La Spezia), Berceto, PR, Italy
6.02 Miles Public Operational Level 3: High (Over 40kW) CCS (Type 2)
Via Volpino 2/B, Filattiera, MS, Italy
6.34 Miles Public Operational Level 2 : Medium (Over 2kW) Type 2 (Socket Only)
Via Carlo Azeglio Ciampi 1, Borgo Val di Taro, PR, Italy
7.04 Miles Public Operational Level 3: High (Over 40kW) CCS (Type 2)
Via Guglielmo Cacchioli 8, Borgo Val di Taro, PR, Italy
7.11 Miles Public Operational Level 2 : Medium (Over 2kW) Type 2 (Socket Only)
Piazza Bosco, Berceto, PR, 43042, Italy
8.8 Miles Public - Membership Required Operational Level 2 : Medium (Over 2kW) Type 2 (Socket Only)
Piazza Bosco, Berceto, PR, 43042, Italy
8.8 Miles (Unknown) Operational Level 2 : Medium (Over 2kW) CEE 3 Pin
Via Lucchi Monsignore 4, Berceto, PR, Italy
8.86 Miles Public Operational Level 2 : Medium (Over 2kW) Type 2 (Socket Only)
Piazza della Resistenza, Villafranca in Lunigiana, MS, Italy
9.33 Miles Public Operational Level 2 : Medium (Over 2kW) Type 2 (Socket Only)
Upload your own photos for this location Sign In
Uploaded by ForumElettrico.it on 2025-04-13
Uploaded by ForumElettrico.it on 2025-04-13
Uploaded by ForumElettrico.it on 2023-06-22
Uploaded by ForumElettrico.it on 2023-06-22
Uploaded by ForumElettrico.it on 2023-06-22
Uploaded by ForumElettrico.it on 2023-06-22
Uploaded by ForumElettrico.it on 2023-06-22
Uploaded by Roberto on 2022-04-01
Uploaded by ForumElettrico.it on 2021-02-28