To edit, add comments or upload photos: Sign In
Poste Italiane Ufficio postalecharging location
Nearest Address:
Via Lucchi Monsignore 4
Berceto
PR
Italy
Number Of Stations/Bays:
2
Usage:
Public
Operational Status:
Operational
Latitude:
44.509655
Longitude:
9.991163
OCM Ref: OCM-494863
Data Provider:
Open Charge Map Contributors http://openchargemap.org
Data License:
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 100 out of 100
- User Feedback - Has recent user verification
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Socket Only)
Status Unknown
4 Present
OCM-CN-841535
22 kW
AC (Three-Phase)
Add your own comment/check-in for this location:
Sign In[ General Comment , Charged Successfully ]Due colonnine a gestione Poste Italiane dotate di 2 prese tipo 2 da 22 kW situate a pochi minuti a piedi dal centro, dove troviamo negozi e servizi di vario tipo. Leggi la recensione completa qui: https://www.forumelettrico.it/forum/colonnine-poste-italiane-22-kw-ufficio-postale-berceto-pr-via-lucchi-monsignore-4-t46344.html
https://www.forumelettrico.it/forum/colonnine-poste-italiane-22-kw-ufficio-postale-berceto-pr-via-lucchi-monsignore-4-t46344.html Comment by ForumElettrico.it 06/21/2026 17:31:48
Other Charging Locations
There are 9 matching results
Piazza Bosco
1
4
0.17 Miles
(Unknown)
Operational
Level 2 : Medium (Over 2kW)
CEE 3 Pin
(Unknown)
Operational
Level 2 : Medium (Over 2kW)
CEE 3 Pin
EnelX Berceto Piazza Bosco
1
2
0.17 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Enel X Way AdS Tugo Ovest
3
10
3.02 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Plenitude Ghiare
1
5
4.32 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Enel X Cassio
1
6
5.79 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Villaggio ecologico di Granara
1
4
6.04 Miles
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Blitz Power AdS Montaio Ovest
3
9
8.86 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Enel X Way Calestano
1
5
9.07 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Enel X Way Cimitero di Bardone
1
5
9.64 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2026-06-21
Uploaded by ForumElettrico.it on 2026-06-21
Uploaded by ForumElettrico.it on 2026-06-21
Uploaded by ForumElettrico.it on 2026-06-21
Uploaded by ForumElettrico.it on 2026-06-21